Full downdraft spray booth GL serials | ||
Size (L x W x H) |
Inside Size | 6900 x 3900 x 2700mm |
Outside Size | 7000 x 5400 x 3500mm | |
Foundation and Floor | Foundation | Full metal foundation, 5 rows bearing weight steel grids |
Metal Basement | 300mm height, the ventilation effect is better than traditional spray booth | |
Drive-in Ramps | 2 units, diamond plate construction | |
Wall and Door | Wallboard | Adopt high quality double construction fireproof insulation EPS panel(Rock wool as option), thickness: 50mm |
Roof Panel | Roof panels adopt galvanized steel plate bending forming | |
Entrance Door | Door with metal sheet frame, 1 set, size: 3000 x 2600mm (W x H), tempering glass observation window | |
Personnel Door | 1 set, size: 800 x 2000mm (W x H),tempering glass observation window | |
Light System | Ceiling Lighting | 10 units, each 4 x 18w, adopt LED energy saving light, tempering glass |
Side Lighting | 8 units, each 2 x 18w, adopt LED energy saving light, tempering glass | |
Brightness | ≥700 LUX | |
Filtration System | Pre-filters | Grade G2 plate type fiber glass filter |
Ceiling Filters | Adopt high efficient adhesive filter, which can capture the dust who is more than 4μm, its filtering rate reaches 98% | |
Bottom filter | Fibreglass paint-stop filter | |
Exhaust Filters | Fibreglass paint-stop filter and active carbon filter | |
Ventilation System | Inlet Fan | Adopt big impeller centrifugal fan 1 x 7.5KW , Three-phase, 380V, 50HZ |
Outlet Fan | Adopt big impeller centrifugal fan 1 x 5.5KW , Three-phase, 380V, 50HZ | |
Total Fan Capacity | 24,000m³/h | |
Air Flow Speed in Cabin | 0.20-0.30m/s in loaded booth | |
Painting and Baking Exchange System |
Solenoid valve+ pressure adjustment control cylinder driven damper exchange | |
Air flow adjust | --- | |
Manometer | --- | |
Duct | Straight pipe: 5 meters, bending pipe: 2 units,soft connection: 1 unit, flange connection | |
Flue | Galvanized pipe: 5 meters, bending pipe: 2 units | |
Heating System | Heating Exchanger | Adopt high efficient heat-resistant stainless steel as cycling heat exchanger |
Burner Model | Adopt 1 set RIELLO diesel burner G20, each heating capacity 180.000kcal/h (gas burner or infrared light heater as option) |
|
Heating Time | 5-7 minutes (from 20 to 60ºС) under baking status, max baking temperature is 80°C | |
Control Box | Control System | Standard control system |
Function | Painting, warm painting, baking, lighting, emergency stop switch, baking time setting, temperature setting, over-temperature alarm indication, baking delay stop protection, temperature limiter , error alarm | |